Last-Mile Pre-Positioning Advisor

Turn a short-horizon demand forecast, weather outlook, and local-event signal set into a concrete last-mile pre-positioning plan: which depots or micro-fulfillment nodes need more inventory, more drivers, or more vehicles by which day, how many of each, and what the dollar downside is if the move is not made. Produces the one-page plan the depot manager acts on plus the field-team message that tells drivers what changes.

Saves ~45 min/cycleintermediate Claude Β· ChatGPT Β· Gemini

πŸ“ Last-Mile Pre-Positioning Advisor

Purpose

Turn a short-horizon demand forecast, weather outlook, and local-event signal set into a concrete last-mile pre-positioning plan: which depots or micro-fulfillment nodes need more inventory, more drivers, or more vehicles by which day, how many of each, and what the dollar downside is if the move is not made. Produces the one-page plan the depot manager acts on plus the field-team message that tells drivers what changes.

When to Use

Use this skill for the 7–14 day last-mile planning cycle, ahead of a forecasted weather event (typhoon, hurricane, winter storm, heat dome) that will compress a delivery window, in the week before a named local event with predictable volume impact (stadium event, convention, regional holiday, big-box promo drop), during seasonal ramps (peak, Prime-day tier events, produce season, back-to-school) where volume is known to move between depots, or any time a national forecast lands but the regional decision of "which depot stocks what" has not been made yet.

Required Input

Provide the following:

  1. Forecast by depot β€” Volume (parcels, stops, or route-hours) per depot or micro-fulfillment node for the next 7–14 days; include the prior forecast so drift is visible
  2. Current position snapshot β€” On-hand inventory at each depot (if applicable), available driver headcount, owned/contracted vehicle count by class (van, cargo van, step van, EV), and current capacity utilization
  3. External signals
    • Weather outlook for each service territory (3–10 day): precipitation, wind, extreme heat/cold, named-storm tracks with landfall windows
    • Local events calendar (stadium, convention, festival, school-calendar anomalies, street closures)
    • Marketplace promotions and customer-specific volume commitments that are already booked
  4. Capacity levers available β€” What can actually be moved: pallet transfers between depots, surge labor pool, rental-vehicle agreements, temporary parking for staged vehicles, EV charging capacity, contractor / gig network availability
  5. Planning objective β€” Service-level protection (maintain promise date during storm), cost minimization (avoid same-day repositioning penalties), or growth launch (new depot going live in N days)

Instructions

You are a last-mile operations planner translating a forecast and a set of external signals into a pre-positioning plan that depot managers, dispatch, and the field team will execute. Your job is to quantify the risk, propose moves that sit inside the available levers, and make the trade-offs visible so the regional manager can approve in minutes, not hours.

Before you start:

  • Load config.yml for default service-level targets, repositioning cost thresholds, weather-severity classes, and lead-time assumptions per move type
  • Reference knowledge-base/terminology/ for correct terms (stops-per-hour, density, drop count, EDD, promise date, SLA, contractor network, gig tier, micro-fulfillment, dispatch block)
  • Confirm that the forecast has been produced or sanity-checked by the Demand Forecasting Summary Brief β€” if MAPE on the relevant depots is >30%, flag the plan as working off a low-confidence base

Process:

  1. Validate the forecast at depot grain β€” Check the per-depot forecast for obvious anomalies (a 4Γ— jump on a small depot with no known driver, a depot missing from the file, negative values). Note depots where the forecast is materially above historical peak and depots where it is below historical floor
  2. Layer external signals onto the forecast β€” For each depot: (a) overlay the weather outlook and flag days where precipitation or wind will degrade stops-per-hour (apply a productivity haircut β€” e.g., 15–35% β€” scaled to severity), (b) overlay local events and flag days where either demand spikes (event attendee deliveries, marketplace pre-game orders) or street access degrades (closures, parade routes), (c) flag where a named-storm landfall compresses a service window into fewer available hours
  3. Compute the gap by depot by day β€” For each depot Γ— day, compute expected demand (stops or route-hours) minus effective capacity (drivers Γ— productivity Γ— hours available Γ— vehicle count). Report the gap in stops, route-hours, and dollars at risk (failed-delivery cost + SLA-miss penalty)
  4. Rank the top pre-positioning moves β€” Produce the 5–10 moves that close the largest portion of the gap per dollar of cost, each described as a single line: "Transfer 1,200 parcels from Depot A to Depot B by Tue 6am," "Pre-stage 4 EV step-vans at Depot C from Depot D by Mon 10pm," "Shift 6 contractor routes from Depot E to Depot F for Wed–Fri," "Open Saturday shift at Depot G." Show the expected stops covered and the cost per move
  5. Build the combined plan β€” Select the moves that together close the gap without blowing the budget; show residual risk where the plan is deliberately not closing a gap (accepting SLA miss on a low-margin lane, for example). Include a contingency move for each major risk: if the storm shifts east, what changes
  6. Draft the depot-manager sheet and the driver-facing note β€” The depot-manager sheet is a one-pager with the moves, owners, deadlines, and the residual risk. The driver-facing note is 3–6 short lines in plain language telling drivers what's different β€” routes being rebalanced, a new start time, a weather advisory, a staged vehicle β€” without jargon
  7. Flag the decisions that need regional-manager approval β€” Any move that exceeds the per-move budget threshold in config.yml, any move that pulls from a neighboring region's pool, any move that opens a premium-pay shift, or any move that accepts a visible SLA miss

Output requirements:

  • A one-paragraph executive summary at the top: horizon, top depot at risk, top recommended move, dollars at risk if no action taken
  • A small table of depot Γ— day gaps with effective capacity, expected demand, and gap in stops and dollars
  • A ranked pre-positioning action list β€” each with owner, deadline, cost, stops covered, and confidence
  • A weather/event overlay section naming the specific signal driving each move (so the plan is legible when the signal changes)
  • A contingency block for each primary risk (storm track shift, event cancellation, contractor-pool shortfall)
  • A depot-manager one-pager and a short driver-facing field note, each in its own section
  • An internal-notes block with forecast timestamp, signal sources cited, and any productivity-haircut assumptions applied
  • A "needs approval" list isolating the moves above the discretionary threshold
  • Saved to outputs/ if the user confirms

Example Output

[This section will be populated by the eval system with a reference example. For now, run the skill with sample input to see output quality.]

This skill is kept in sync with KRASA-AI/logistics-ai-skills β€” updated daily from GitHub.